March 26, 1997
To: Phase II Planning Members
From: Larry Vasquez
Re: Phase II Meeting Minutes
Attached are the meeting minutes from the recent Phase II meeting last
week.
Larry
~~~~~~~
Phase II Planning
Meeting Minutes
3/19/97
Meeting Attendees:
Name Company Tel. No. Fax No. E-Mail Addr.
Baldwin,Brian Ameritech 847-248-5324 847-248-3977 brian.baldwin@amerite
ch.com
Christiansen, Axel AG Comm.
Systems 602-582-7718 602-581-4862 christia@agcs.com
Felice, Philip Sprint/Centel 847-768-6750 847-296-4724
Gerads, Dave AG Comm.
Systems 602-581-4162 602-582-7111 geradsd@agcs.com
Glynn, Seamus Citizens Utility Bd. 312-263-4282 312-263-4329
Hardaway, Denise Ameritech 810-424-0276 810-424-1073
Hargraves, LaVerne AT&T 908-580-8416 908-580-8501 lavh@att.com
Joerger,Jim MCI/Metro 214-498-5084 214-918-1499 jjoerger@mcimail.com
Jones, Bob Ameritech Cellular 847-765-5813
Jones, Rick Illinois
NENA 815-654-5015 815-633-0555 rockford9@aol.com
Kalbow, Wayne Lucent
Technologies 630-224-6446 630-213-4833 kalbow@lucent.com
Krall, Bill Bellcore 908-758-4296 908-758-4435 krall@cc.bellcore.com
Long, Pete Cellular One 847-762-2042
Manshio, Calvin for TCG 773-506-2300 773-506-2370
Marshall,
Roger Ameritech 847-248-5482 847-248-6746 roger.marshall@ameritech.com
Meekins, Pat AT&T 908-580-7798 908-580-8501 meekins@att.com
Minch,
Bill DSC 630-571-8121 630-571-3422 william-minch@qmgate.dscc.com
Murphy, Joseph Cellular
One 217-352-1800 217-352-1083 jdmurphy@meyercapel.com
Murphy, Shawn AT&T 908-580-8741 908-580-8501 shawn.p.murphy@att.com
Pfautz, Penn AT&T 908-949-8918 908-949-5268 ppfautz@att.com
Shumada, Irene Nortel 613-763-1486 613-763-7236 ishumada@nortel.ca
Struthers, Brent,
A. ICC 312-814-6025 312-814-1818 bstruthe@icc084r1.state.il.us
Udeshi, Rajendra, P. Siemens/Stromberg-Carlson 561-955-6406
Vasquez, Larry AT&T 312-230-6253 312-230-8343 lvasquez2@att.com
Meeting Agenda
Feedback on demand for location portability
Update to Docket 95-116 Order that DOES include Wireless to Wireline
Review Billing & Switching Enhancements for Phase II
Number Conservation.......Where should we address?
Larry Vasquez ( Co-Chair) opened up the meeting addressing the agenda
and whether it was appropriate to include Brent Struthers
request/concern to include number conservation /number exhaust in the
Phase II planning team.
It was decided that number conservation needed to be addressed but was
not really and LNP Phase II issue. The group concluded that number
conservation would be addressed by the same team but separately from
the Phase II LNP meeting. Therefore, the Steering Committee meetings
look like this:
9:30-12:00 Illinois Steering Commission Status Reports
12:00-1:00 Lunch Break
1:00-2:30 Phase II Planning Activity
2:30-2:45 Break
2:45-4:15 Number Conservation/Number Exhaust Issues
Every effort will be made to keep to this tentative agenda but
circumstances, like Barry Bishop updates, may require some flexibility
(only kidding Barry).
Back to the agenda!!
Roger Marshall (sitting in for Brian Baldwin, Co-Chair) stated that
Brian had sent him an E-Mail on information regarding updated
information on the demand for Location Portability. However, Roger
did not bring the E-Mail with him. More information on demand from
Brian in the next meeting.
Roger Marshall presented two pages of potential Phase II Requirements.
The list were distributed to everyone and the major headings are as
follows:
* General Switching and Signaling Requirements
* SCP Applications Requirements
* Operator Services Requirements
The Phase II team action items are as follows:
* Review the requirements list
* Determine, under each category, what if anything is missing
* Add missing items
* Prioritize ALL items to be addressed in Phase II
* Determine if there are any NPAC implications
* For each item, determine if the requirement is in the low/med./high
cost range
* Send any additions to Larry Vasquez to merge with Brian's list
Larry Vasquez will call Char Meins, AT&T Wireless, and let her know
that an update or an overview on the CTIA document is expected in the
next steering committee meeting. This will help the Phase II team
better understand the industry direction and the impact on Phase II.
**********************************************************************
Number conservation discussions
Lots of discussions on the right solution(s) for number exhaust/number
conservation.
Every vendor/Service Provider has their favorite solution. We will be
discussing the various options during the next meeting. All vendor's
and service providers must notify Brent Struthers, by April 10, on
whether a presentation will be given in the next session. If the
answer is yes, then a copy of the presentation should be forwarded to
Brent for review/duplication.
The following are some of the potential industry solutions that we
will probably discuss and get feedback on in the next meeting:
NXX-X
PORC (Portability Outside the Rate Center)
Rate Center Consolidation
TPM (Terminating Point Master) (TCG Proposal)
GUBB (Geographic Unit Building Block)
Geographic Number Portability
Etc.
Please be prepared to help us rank and hopefully eliminate some of the
above proposals that would not be feasible from an industry
perspective.
The Next Steering Committee/Phase II/Number Conservation Meeting is
scheduled
on April 24, 1997 from 9:30- 4:15
Larry Vasquez
Technical Support Manager