On Thursday July 17 the Detroit SPOC Team met via Conference bridge number, 1-800-593-XXXX passcode "XXXX", at 10:00 AM CDT.
The next meeting will be Thursday July 7/24 9:00 AM CDT via conference call bridge listed above.
Those SPOCs who took part in todays meeting were as follows:
Name Company Fax
=============================================================================
*Dick Dowd LLC/ICC Work Shop
*Bob Bartenstein Ameritech
*Hampton Oberle MCI
*Rick Arzadon TCG
*Anne Driscoll MCI
=============================================================================
It is assumed that those companys that will participate in some form of
Inter-Company Testing in Detroit are as follows:
MCI
TCG
All others, by their absence are not being planned for.
=============================================================================
Single Point Of Contact Meeting Issues & Actions
==============================================================================
ISSUE: Each participating company needs to determine which specific
ACTION: Each SPOC is to review the FCC Field Test Plan
with their Task Force to determine which specific test scripts will be able to be performed by their companys network topography within the Chicago MSA.
RESPONSIBLES: SPOC Team.
STATUS: Assigned June 12
ISSUE: A certain amount of Network Data information needs to be gathered
ACTION: Each SPOC will need to fill in the Network Data form for Detroit
and send it to Dick Dowd ASAP.
RESPONSIBLES: SPOCs
STATUS: Assigned June 12
LIVNMINWDS0 LIVONIA NW DSO DMS100 LIVONIA/PLYMOUTH 313/542
inter-company testing in the Detroit MSA needs to determine within which rate centers their switch does business and provide that information to Dick Dowd as soon as possible. July 11th if at all possible.
RESPONSIBLE: MCI and TCG.
STATUS: Complete. All three have switches in the Detroit 6 rate
center. Ameritech MCI and TCG are all looking at Livonia as this would allow Ameritech to test using their DMS-100.
Livonia was selected.
Ameritech
NPA-NXX 313-542
TCG
NPA-NXX 313-853
MCI
NPA-NXX 313-452
General Information:
Dates
SPOC.
MCI - Not Ready at this time.
TCG - Not Ready at this time.
SPOC.
MCI - Not Ready at this time.
TCG - Not Ready at this time.
based upon LNP capable switch dates.
9/26 Completion of LNP Testing for Detroit.
Dick Dowd
Detroit Inter-company Test Coordination Manager
LLC/Midwest Region
972-498-5069
972-498-5022 alternate fax
Vnet 757-5069
Pager 1-800-PAGEMCI Pin# 1742797
Email Richard Dowd / MCI ID: 258-4443