On Thursday April 17, 1997 the weekly Single Point Of Contact Conference Call
was held via conference bridge, 1-800-593-XXXX
passcode "XXXX", at 9:00 AM CST.
The next meeting will be Thursday 4/24 between the hours of 9 & 11
AM CDT via conference number 1-800-593-XXXX using passcode "XXXX". For those
who will be dialing using Vnet, 475-XXXX the
same passcode.
It is critical to have at least one representative from each participating
company actively participating on each call.
Those who took part in today's call were as
follows:
Name Company
==============================================================================
*Dick Dowd LLC/ICC Work Shop
*Mitch Fuchs AT&T
*Joe Belcore
No representation MCI
*Walt Subora Ameritech
*Rajeev Trika TCG
*Larry Lovett SPRINT
No repreentation WorldCom
==============================================================================
ADMIN:
------
The need for SPOC's to work the issues offline and report status prior to the
scheduled conference call was discussed. All who participated in the conference
call agreed that this was the proper procedure
to follow.
To help make progress and to best utilize your
resources it is asked that:
1. If Assigned an Action, the SPOC is to work the action off line, during the
week, through their own company and report status as early as possible to
Dick Dowd via EMail.
2. Please provide your status via Email by noon on Wednesday's so that I may
have time to assemble them for presentation to
the Team.
Note We do not attempt to resolve assigned Actions and Issues during the
conference call, as most of these involve work
within the SPOC's company.
Conference Calls:
----------------
If at least 4 of the participating company's are represented on the call, the
Team will abide by the consensus of those present. If at least 4 company's
are not represented, no business will be transacted.
Agenda:
-------
Single Point Of Contact Meeting Issues & Actions
===============================================================================
At least 4 of the particapating company's were represented so the Issues
and Status's were reviewed.
ISSUE: * The FCC Field Test Coordination Manager has requested that each
SPOC provide one person in the Chicago area 5 days for
the duration of the FCC Field Test. This person will need
to attend a daily kickoff meeting in person and be within
15 minutes of the NPAC to respond to emergency meetings.
ACTION: Each SPOC to work through this request with his/her company and
their resources to determine if this is workable and report their
findings to Dick Dowd via Email.
RESPONSIBLES: SPOC Team
STATUS: All Trial Participants will have representatives present
in the Chicago area to support the Chicago Illinois FCC Field
Test, or on call within 15 minutes of notification for a meeting
with the exception of Ameritech and possibly SPRINT.
Action: In the spirit of Team building Dick Dowd will escalate
to Brent Struthers, ICC, and request support from Ameritech
to match the level of committment provided by the other
participating company's.
RESPONSIBLE: Dick Dowd
STATUS: 4/10 Contacted Brent Struthers, ICC, via Email and requested
his assistance to help the participating company's to dedicate
resources to the FCC Field Test as requested. All Trial
Participants will have representatives present in the Chicago
area to support the Chicago Illinois FCC Field Test, or on call
within 15 minutes of notification for a meeting
with the exception of Ameritech and possibly
SPRINT.
ACTION: Each SPOC is to begin, if they have not already done so, to review
the FCC Field Test Plan, available at www.ported.com and
www.cameos.com, with their Task Force to determine which specific
test script's will be able to be performed by their company's
network topography within the Chicago MSA. (NOTE) Once this
input is obtained a matrix of test cases will be built that will
indicate each test case and which company's will be performing
which test cases. This will help to ensure that a through Field
Test is performed and also help to identify areas where some of
the participating company's can perform certain test's while others
perform other test's.
RESPONSIBLES: SPOC Team.
STATUS: Assigned 3/20.
4/10 All targeting 4/25/97.
SPRINT may not be able to meet 4/25.
ISSUE: * In preparation for the FCC Field Test, certain network items
need to be gathered and distributed to the
participating company's.
ACTION: Each company is to determine what SSN will be used for CLASS
testing and which point codes will be utilized during the testing.
Each SPOC is requested to open these discussions within their own
company and report the status to Dick Dowd Via
Email.
RESPONSIBLES: SPOC Team
STATUS: Assigned 3/20.
3/27 TCG / Rajeev Trika - TCG will use a 5ESS Switch
The point code is 005004160.
TCG will have 10 DNs per prefix that are available for test:
773-420-XXXX thru XXXX
847-720-XXXX thru XXXX
847-813-XXXX thru XXXX
630-274-XXXX thru XXXX
630-743-XXXX thru XXXX
815-280-XXXX thru XXXX
SSN = 251
translation type = 251
alias point code = 232003000
3/30 Ameritech / Robert Bartenstien -
T-CAPS for CNAM and LIDB will be exchanged via the Regional
STP's:
CHCGILWB01W 250-001-000
ELGNILEL01W 250-000-000
ALIAS 250-002-000
In the Chicago area, T-CAPS for CLASS and ISVM (if needed)
will be exchanged via the Local STP's:
DRFDILDF01W 250-003-000
RVDLILRD01W 250-004-000
ALIAS 250-005-000
And maybe this pair, depending on whether the CLEC decides to
link into these STP's (both pairs are in LATA
358):
BNTOILBA01W 250-021-000
LGRCILLG01W 250-022-000
ALIAS 250-023-000
The following SCP's will actually be the nodes that send the
queries to their networks, and thus these point codes will
appear as originating point codes on the messages (the STP'S
will simply MTP route the messages, whether it be the LSTP's
or the RSTP's):
(LTNP SCP's HOMED TO BNTO/LGRC LSTP's)
CHCGILFRA52 250-080-001
EDNDILDUA51 250-080-002
ALIAS 250-080-000
(LTNP SCP's HOMED TO DRFD/RVDL LSTP's)
CHCGILWBA54 250-081-001
ELGNILELA53 250-081-002
ALIAS 250-081-000
Participants should provision their networks to receive queries
from any of these SCP's, regardless of which LSTP's they are
linked to, because we may shift traffic, due to load
requirements, between SCP pairs.
SSN 251 will continue to be the CLASS application number for
SSP's.
ISVM is 249.
telephone numbers that Ameritech will be using for the LNP
InterCompany test this summer:
Downers Grove
630-435-
630-435-
630-435-
630-435-
630-435
Joliet Main
815-726-
815-726-
815-726-
815-726-
815-726- ISDN
815-726-
815-726-
815-726- ISDN
815-726-
815-726-
815-726-
815-726-
815-726-
815-726-
815-726-
Stewart 1AESS
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
773-994-
4/09 WorldCom / Betty Shelby targeting 4/25.
4/09 MCI / Hamp Oberle - Next week.
4/09 AT&T / Eileen O'Shea - Targeting end
of the week.
4/07 SPRINT / Larry Lovett - received in person.
SWITCH NPA NXX RATE CENTER LRN TEST NUMBERS
Des Plaines 773 825 Chicago Ohare
5ESS 847 296 Des Plaines 847-296-
LNP Ready 297
5/9/97 298
Point Code 299
230-024-001 375
391
803
759
847-759-
824
827
Park RIdge 773 380 Chicago Newcastle
DMS-100 399
LNP Ready 864
5/20/97
Point Code 847 318 Park Ridge 847318-xxxx 847-318-xxxx
-
4549
RSTP (Johnson City/Bristol) Alais PC 239-001-000
LSTP (Lima/Mansfield) Alais PC 239-215-000
LRN AIN TT=11 SSN=248
LRN IN TT=11 SSN=236
CLASS TT=251 SSN=251
LIDB/ABS TT=253 SSN=253
CNAM TT=5 SSN=232
USVN TT=NUL SSN=NULL
ISSUE: * Each Service Provider needs to define their network so
that an overall FCC Field Test Topography can be determined.
ACTION: Identify each participant's network's and trunking and
provide to Dick Dowd via Email ASAP. So that this information
can be combined and the FCC Field Test Topography can
be reviewed at the next face-to-face.
RESPONSIBLES: SPOC Team
STATUS: Assigned 4/09.
AT&T - Mitch Fuchs Emailed a copy of the AT&T network
to be used for the FCC Field Test on 4/15.
No other input was received.
ISSUE: * It was suggested that the SPOC Team assemble a Checklist of
all items that need to be addressed by each participating
company prior to the kick off of FCC Field Testing on July 24,
1997.
ACTION: Each SPOC is to initiate a Checklist of items that they feel
need to be addressed prior to July 24, 1997 and submit it
to Dick Dowd via Email. These will be shared with all
participating company's so that the SPOC's can
track progress.
RESPONSIBLES: SPOC Team.
STATUS: Assigned 3/20.
4/09 The Testing Committee put together a draft project plan
listing many milestones. Dick Dowd copied the tasks to MS
Project. Ameritech then printed copies and distributed them
to those present. These tasks were then reviewed by the
Testing Committee. Dick Dowd will rework the tasks and suggest
dependencies. Once this is formulated Dick will distribute
the Project Plan to the SPOC Team for review and finalization.
Dick will distribute this project plan prior to the next
SPOC Team conference call 4/17.
4/17 Dick DOwd is working on the update and will have it
distributed prior to the next conference call.
NEW ISSUES AS OF 4/17/97:
ISSUE: How will participants be able to transport ISUP messages across
the network for the FCC Field Test?
ACTION: Each SPOC to determine whether they will be wanting to
test ISUP messaging during the Field Test.
RESPONSIBLES: SPOC Team
STATUS: Assigned 4/17
=======================================================================
ISSUES: * Test Script Prioritization, Overall Test Time Line & Porting
partners are all valid issues that will need to be addressed
but they are dependant upon Action's above.
Thanks,
Dick Dowd
FCC Field Test Coordination Manager
LLC/ICC
972-498-5069
972-918-1499 fax
972-498-5022 alternate fax
Vnet 757-5069
Email Richard Dowd / MCI ID: 258-4443